Life Community Church – Interim Building (Phase 1)

This project consists of a new interim Life Community Church located at 10 Vice Regent Boulevard in Etobicoke, Ontario. The pre-engineered steel framed and clad building includes a high-volume Sanctuary/Multi-Purpose room, surrounding program and support spaces, together with a second-floor mezzanine area of program and support space. The approximate gross floor area of new construction […]

View Project

Confederation Beach Park

The project site is located towards the eastern end of Confederation Beach Park, on Confederation Drive in Hamilton Ontario. The design involves converting 19 acres (833,200 sq.ft.) of an existing campground into a sports park with a multi-phase construction approach. The redeveloped area will include: a full-size cricket pitch that will also function as two […]

View Project

Memorial University Newfoundland Animal Resource Centre

Memorial University Newfoundland’s new Animal Resource Centre (“ARC”), located in St. John’s Newfoundland, will house research in the fields of Biomedical Science, Psychology, and Neuroscience. The four-level, 45,000 sq. ft. vivarium structure will connect with the existing facilities and also accommodate future expansion. A.W. Hooker collaborated with NXL Architects to provide cost management services at […]

View Project

Windsor City Hall

“It’s great news,” Mayor Drew Dilkens said. “A lot of people thought this was just a budget number and that it was going to go over. But because we hired a cost consultant to work on our behalf, we felt very comfortable going in that we would hit the mark, that we shouldn’t have bids […]

View Project